Just a few of the many, many crates I've built over the years. (Carmen, DMMO '23) Radio Refinish (Completed). (Dangerous Corner, UNCSA '23 Newspaper stand (Carmen, DMMO, '23) Philco Radio before refinish (Dangerous Corner, UNCSA '23) Final boat to Purgatory (Orlando Paladino, UNCSA '23) Frame and foam build-out for the dragon boat (Orlando Paladino, UNCSA '22) The purgatory boat (lovingly named Malcor) in our shop (Orlando Paladino, UNCSA '23) Base for Shoes of London set unit. (Kinky Boots, MSMT '22). Built with Jamie Auer. Finished Shoes of London set unit. The most challenging part of this piece was the shoe stands! (Kinky Boots, MSMT '22). Built with Jamie Auer. Don's workstand with added shelves. (Kinky Boots, MSMT '22) Don's rolling workstand, casters mounted inside. (Kinky Boots, MSMT '22) Large worktable (Kinky Boots, MSMT '22). Built with Jamie Auer. Worktable (1 of 2) (Kinky Boots, MSMT '22) Milan Show Sign (Kinky Boots, MSMT '22) Sawhorses (The Color Purple, MSMT '22) Base and headboard of Potiphar's Bed Successful cutout of Potiphar's Headboard Potiphar's Bed onstage (Joseph and the Amazing Technicolor Dreamcoat, MSMT '22) Outline of Potiphar's Bed headboard Harp pieces before assembly Sugarplum Throne (The Nutcracker film, UNCSA '20) Golden Harp (Jack and the Beanstalk, MSMT '22)